S. Juan de Dios Hospital

Sevilla (Spain)

2019/20

The San Juan de Dios Hospital project consisted of the development of the structure of the new building, the completion of the exterior enclosure of all façades, waterproofing and roof flooring. The last phase will finish the extension of the hospital and will mean the completion of the interior of the new building.

Grupo Criptana carried out the manufacture and assembly of rectangular galvanised steel sheet ducts, which will exceed 17,000 square metres, and more than 13,000 square metres of ductwork which was insulated externally with the Isover cover IBER COVER 50. In garages, we were in charge of the assembly of around 4,000 square metres of rectangular sheet metal with CE marking for the compliance with smoke extraction certificates. The rooms will be equipped with fan coil systems where around 3,000 square metres of fibre will also be installed.